大量国产情侣激情视频_一级毛片亚洲有黄_69AV视频在线色播_了解最新淫乱兄妹黄色一级毛片免费送_日韩久久狠狠AV天堂_国产三级理论电影_日韩高清无码免费_国产成人综合网高清_国产精品欧美视频另类专区_午夜限制电影在线观看

News

News

Home| News| News

Hengtong Contributed to Installing the First Turbine of the 100,000-kW Grid-connected Wind Power Project in Tibet

2024-7-22 2541 Font size:

Jiangsu Hengtong Power Cable Co., Ltd. has proudly contributed to installing the first turbine of the 100,000-kW grid-connected wind power project in Tibet. Located at an average altitude of over 5,050 meters, with the highest turbine position reaching 5,200 meters, the project sets a new record for the global wind power industry in terms of altitude.

In the face of extreme environmental challenges, Hengtong developed a new type of power transmission material that enhanced current-carrying capacity by 14%, ensuring reliable power transmission in harsh conditions.

The project is expected to provide 223.7 million kWh of clean energy annually, saving 75,300 tons of coal equivalent and reducing carbon dioxide emissions by about 188,200 tons.

Committed to its goal of reaching carbon peak by 2028 and carbon neutrality by 2045, Hengtong hopes to participate in clean energy transformation and global sustainable development.


6ce26866113e5e61e5841209cad8067.png